wacker
Posts : 4055 Join date : 2010-01-30 Location : S/C PA
| Subject: SSRT website Thu Feb 09, 2012 9:29 am | |
| Check out the updated website... | |
|
wacker
Posts : 4055 Join date : 2010-01-30 Location : S/C PA
| Subject: Re: SSRT website Fri May 11, 2012 11:24 am | |
| May 5th Work Detail Update Email ~~~ Jack Miller led a crew installing signs & collecting trash from Black Bear Trailhead to Viaduct Bridge. Trilby Mayes, Eileen & Terry Long led a crew painting both gates near Black Bear Bridge & treated the wood handrailings on Black Bear & Six Mile Run Bridges. George Holt, Eric Brooks & John Spicer led crews trimming brush, applying mulch at Black Bear Trailhead, repainted the trail markings on Casanova Road & cleaned out ditches adjacient to the crossing. Carl Schmitt, Carol & Charles Jensen led crews collecting waste along Casanova Road from Coaldale Road to Black Bear Bridge & on Main Street Road from the Red Moshannon Creek to the Black Bear Trailhead. They also trimmed trees & brush from Six Mile Run Bridge to the Viaduct Bridge. Pictures HERE | |
|
wacker
Posts : 4055 Join date : 2010-01-30 Location : S/C PA
| Subject: Re: SSRT website Wed May 16, 2012 7:03 pm | |
| The gate on the viaduct side of Peale Crossing was vandalized sometime between May 5 & May 11, 2012. The Snow Shoe Rails to Trails is offering a $1,000 reward to anyone providing information that would lead to the arrest, prosecution and conviction of the person or persons responsible for the vandalism of this gate. | |
|
G Bob
Posts : 1472 Join date : 2010-02-02 Age : 66 Location : Frankford,WV
| Subject: Re: SSRT website Thu May 17, 2012 9:18 am | |
| I pipe gate doesnt stand much chance against a sawzall | |
|
Tequila
Posts : 433 Join date : 2010-07-26
| Subject: Re: SSRT website Thu May 17, 2012 9:58 am | |
| I saw an article dated 4/15 that DCNR is planning to work on the Bloody Skillet connector during the summer season to address "the hill". | |
|
wacker
Posts : 4055 Join date : 2010-01-30 Location : S/C PA
| Subject: Re: SSRT website Mon May 21, 2012 9:06 pm | |
| On May 14,15,16, work details were done on the Bloody Skillet Trails & Snow Shoe Township roads. Work consisted of trimming brush, cutting trees from trail, install/replace missing & vandalized signs, paint gates, collect trash. Bob Fetterling met with the volunteers to review the work needing done and discuss any concerns. Ed Thomas traveled from Ringtown, Pa. Dave & Sara Bastion traveled from Jamestown, NY & of course the normal expected locals Charles & Carole Jensen, Terry Long, Jack Miller & Larry Mayes all worked in the rain all day Monday & faced a shower or two on Tuesday. Eight bags of trash was collected on the Bloody Skillet & 9 bags collected on the Snow Shoe Township Roads from Tennessee Turnpike to The Bloody Skillet Connector. Three gates were painted on Bloody Skillet as well as several large fallen trees removed. Thank you to all the volunteers for taking ownership into our trails and community. May 5th Work Detail Update Email ~~~ Pictures HERE | |
|
Sponsored content
| Subject: Re: SSRT website | |
| |
|